By Intious · Updated September 7, 2026
Multiply simultaneous positions by operating hours. Two continuously occupied positions across a 24/7 week require 336 productive coverage hours.
Build the workload input
There are 168 hours in seven days. Two positions require 2 × 168 = 336 coverage hours before allowance for training, leave or absence. If operating hours vary by day, calculate each day separately.
Convert coverage into FTE
At forty scheduled hours and 20% shrinkage, each scheduled FTE supplies 32 productive hours. The 336-hour requirement therefore needs 10.5 scheduled FTE. Rounding to eleven full-time people gives a starting estimate.
What the estimate cannot solve
Rest requirements, skill mix, shift overlaps and breaks can prevent a simple headcount from covering every interval. Build the roster after estimating capacity, and check the busiest intervals explicitly.
Try it with your numbers
Convert workload hours into productive and scheduled full-time equivalents.
FTE & Headcount Calculator